Showing posts with label work. Show all posts
Showing posts with label work. Show all posts

Ah, I feel so much better.

So, I meant to blog about how much better I felt about the work situation yesterday, but I forgot.

Then last night I went to the gym and Muscles showed me the boxing equipment.

So now I feel even better!

I also FINALLY made a decision regarding the wedding planning.  Not a huge one, but my first decision none-the-less.  I am going to make my own invitations, save the dates, and programs.  I'm not sure how much money it will actually save, because I'm looking at papersource for materials (I LOVE papersource).  But I didn't come to this conclusion as a cost-cutting measure, I WANT to make these.  I've been making my own cards for a while now for birthdays and thank yous.  I figure this is just taking my card making hobby up a level, and will give me a nice calming outlet on the weekends.  Plus this way, I can get EXACTLY what I want out of my paper goods for the wedding.

And I have tons of ideas, and I'm excited to sit down, and plan out my invitations and save the dates.   

Actually, i already have kind of a neat plan for my save the dates, I just need to make it cohesive, and then get a firm date set. 

What's the proper time to send out save the dates?  we have probably half the guest list coming from Ohio, so probably pretty early right?  at least a year in advance for planning?  does that sound right?

Ugh

Some events have gone down recently at work.  I normally try to leave my working environment out of the blog, but I'm so upset with the way things have come down, I have to write about it.

First of all, it's important to note that i am a contract employee.  This means that I work for an engineering firm that makes a percentage of what I earn working on site at a plant.  We'll call the firm i work for Company A, and the plant I'm located on site at Company B.

Well, about a month ago, my boss at Company B pulled aside me and another contractor (who also works for Company A) and told us that our jobs were in danger, and that he needed us to work faster so that he could justify keeping us on staff.  Or rather, if we were already working as fast as we can, to charge less time than we worked... essentially he asked us to work free overtime.  I wont do that, for starters I'm already working for an amount that is lower than the average pay level for my Job, Experience, and GPA.  Secondly, I think that this is unethical of me, providing free labor for Company B, all while taking money out of Company A's pocket.  So, instead, I stressed.  I worked my ass off, and stressed like crazy while I was doing it. 

Meanwhile, Company B is undergoing structure changes.  Company B Boss chooses to not tell his contract employees about this, and we are shut out from all meetings on the topic.  As the direct employees are learning their new assignments, we are left to wait, and wait, and wait. 

The contractors, though talking with other employees, find out that company B Boss is being removed from his position, and being demoted from manager to engineer.  Then we find out that no lay-offs or staff cuts (including contractors) was ever planned (i.e. Our Jobs were NEVER in danger).  Last week, we had a staff meeting, and found out that starting today The contractors have a new boss, and we learn who he is.  He's on vacation this week (and last), and no one is able to introduce themselves at this point.

Then I found out something else.  Company B Boss... he knew where we were headed the whole time.  While he was making us feel like our jobs were in danger, and that he was trying to help us.  He knew BEFORE new boss left for vacation.  He knew when he okayed two and a half weeks of vacation for my friend (vacation that starts this week).  He waited until we were in a meeting with everyone, and told us where we were going, and not only that, That he was taking all of the projects both of us were working on except for the two that we individually liked the least.  From now on my ONLY task involves being outside (which I loved in March and April, but now it's hot and humid and rains twice a week), so if the weather doesn't cooperate, I have NOTHING to occupy my time.  If the weather does cooperate, I also lose out, because going outside mid day here feels like standing on the freaking sun, and it's only June.  My friend was given sole responsibility for a project that Her, Me and ANOTHER engineer were working on up until now.  She had expressed to Company B Boss that she didn't enjoy the project and would like to work on other things.

In short, He screwed us over.

And just when I thought he couldn't possibly be any bigger of a jerk, he pulled aside my friend again, and told her AGAIN that her job is still in danger because of the "upcoming layoffs" (which by the way, we talked to our friends in HR... no layoffs coming).  And that she should be getting even more done now that she's not "distracted" by other projects.

Not only that, but I could've been preparing for my transition to my new area while my new boss was here, but instead I had to leave my office (my big pretty office with a window) to share a cubicle with another person to make room for someone moving to this area. 

I cried a lot about this on Wednesday.  I went to Vegas, pushed it out of my head for the weekend, but now I'm back, and I keep getting more furious about how this all went down.. 

I feel like this whole month has been some kind of mind game, or last minute grasps for power.  I went on the vacation of a lifetime (Mexico) all the while stressing about whether or not my job would be there when I got back.  All I can say now is that I'm glad to be moving out of this environment and into a new phase of my Career here at company B.  I already know most of my new co-workers, and they're nice, they're fun, and I like them.  I haven't had a chance to meet my new boss yet, but from what I understand he's super nice, and much more personable than my old one. 

I just keep trying to focus on the positives.  I get to move out to a fun building that is in the heart of the plant.  I get a new boss who doesn't intimidate me and try to scare me into working for free.  I GET TO WEAR JEANS, and will be allowed to wear my steel toed boots as my normal footwear (instead of changing in and out of them because they do not match my "professional attire"), i wont be sent an e-mail about the dress code if it's a cold morning, and the only thing warm I have in my car is a hoodie and I wear it into the building then immediately take it off (even though the pipe designers who work across the hall from me get to wear jeans, tennies and hoodies every day).  I still actually have a Job, when so many people don't.  The work I've done for that area in the past has always ended with me being told "I really appreciate that you did this for us, Thank you so much" when everything else I've done here has been met with "not fast enough", "you forgot this ONE TINY thing, but I'm going to yell about it anyway" and worst of all: plain silence.  At least, in my new capacity i stand a chance at feeling appreciated, comfortable, and happy.  All in all the move is a good thing, I just wish it didn't all come down like this.  What a jerk.

Ugh

At work, I have several assignments, but I seem to finish them 3 times faster than intended and it causes me to wind up sitting around with no work for a few days, so I'm trying to take my time on my current assignment, to make sure it holds me over til the next one that will start in July.
 
SO What have I done today?
 
Approximately 3 hours of work, 2 hours of blog reading, 1 hour of gabbing, and 3 hours of making and editing excel spreadsheets for personal use. (And I'm still ahead of schedule)
 
People who don't know me as well may not know, but like most young engineering types, I LOVE excel.  It's perfect for all of life's lists.
 
Today, I made a "what to pack" list for my trips to Ohio, Mexico, and Vegas.  Then I started work on converting the list I have for when I sent out Graduation Invites to a list for when i eventually get to send out wedding invites.  I know it's pretty far off in the distance, but a girl can never be too prepared.  I've never looked back on anything and thought "you know, I planned this FAR too well, I wish I had planned worse".  I also balanced my checkbook (also in excel)
 
I'm watching the clock and ready to leave in 10 minutes.
 
Everyone here seems to be stressed this week.  I'm not sure why, there's just been this "cloud of doom" even though we have plenty of work (they even hired a new engineer).  I think the whole office got PMS or something (forget the fact that it's roughly 85% male here).
 
Okay, I've killed the 10 min.  Time to go meet up with Muscles at the gym and get in my workout.

Accomlishments

In the spirit of bogging about getting things done, I've accomplished quite a bit at work today. Though my list doesn't look as impressive as Amber's list, it's a lot for my job:

-Got to work, and waded through several e-mails full of information for the day's calculations
-Sized a Process Safety Valve based on Liquid Thermal Expansion for a heat exchanger, complete from start to finish in a mere 3 hours (this normally takes all day)
-Had a nice lunch of veggie burgers with carrots and celery on the side.
-Sized another PSV in about 2 hours, and even ANOTHER in another 2 hours. They both need more info before I can call them complete, because I need to look at drawings and decide if these pieces of equipment are at risk for overpressure due to fire, so they are either 90% done or 50 % done. I also need to look at the same drawings and calculate some pressure drops.
-wrote design summaries for all the PSVs with plans to go bakc and edit the two later ones with a line or two once I have more info.

And now here I am, accomplishing roughly 2 days worth of work since 7:30 am. I got to work about a half an hour late today, so I have to stay until six. If I had work I could be working on, this wouldn't be so bad, but, alas, I've used up all my given information for this project, and must await another batch of Information from Texas before I can press on. So, I blog.

I know that a workday in my life seems dull to most; a 10 hour shift of math, chemistry, process simulations, and excel. But to me, well, I can't think of anything I'd like to do as a career more. I come in every morning, and make this plant a safer place, I prevent major plant explosions with these calculations, and that makes me feel so important. It gives me a sence of worth that few other things can.

Plus, it helps that I'm a total dork for this stuff. Seriously. I like math. And I really enjoy the time I spend working on these projects.

Another Monday, another Dollar.

So, at some point this weekend I pulled a muscle in my chest, and while it's not the most painful things I've ever experienced, it's definitely the most painful thing I've experienced lately. The muscle is "underneath" my boob. Not the part where I can lift up my boob and place a heating pad on it, but rather, in the inaccessible area blocked by my boob fat. This is preventing me from using ice or heating pads to relieve any pain. Plus anytime my boobs jiggle it pulls on the muscle a little more, and hurts a lot more. I have big boobs. They jiggle anytime I move. So I have to be as still as possible. Also, I'm all out of sick days at work thanks to that nasty flu, so I'm kind of stuck here unless I want to work on Friday, but I certainly don't want to do that. My cousin Rose is coming in from Boston this week, and we are spending Thursday night in New Orleans.

I also did a little bit of math this morning, and Over January and February I spent over EIGHT HUNDRED dollars at Sephora, and visited the store 7 times. They need to move it so it's not on my way home from work anymore. I'm also going to place a 2 item per visit limit for now, because clearly, banning myself from the store doesn't work. The reason I spend so much is that I'll "drop by" to pick up a mascara, and then I'll go crazy picking up eye shadows and lip glosses, and dior moisturizers. I mean, I don't regret any purchase… I just have enough eye shadows for now.

Speaking of which, I've collected a substantial amount of loose powder shadows lately… anyone know of a good system when I can keep 7 or 8 (or even 9 or 10) loose shadows in kind of a refillable palette? Something that would be easy to throw in my makeup bag. I've searched the internet, but can't seem to come up with anything that doesn't involve adding alcohol to the shadows and pressing them into regular style eye shadows. I prefer the loose powders, and I'd like to keep that… just, in a smaller container, grouped together with other smaller containers. I've even considered buying a paint by numbers kit, and washing out the paint pots to use that…

The Plague

well, I got sick on Monday, as you know. I went home, and when I came back to work on Wednesday, everyone else had gotten sick too! There's a stomach flu/cold 1, 2PUnch going around the office, and I just happened to catch them separately, because, now I have the cold portion. FABULOUS. At least I can get work done with a cold, and don't have to burn anymore vacation time.

In other news, I made an appointment to look at my very first house on my very first house hunt for tomorrow, and will be looking at a house, that I will probably never buy because it's a small house, in a cookie cutter neighborhood, and it looks like all the homes surrounding it. On the other hand the homes are all new, and the walls come pre-painted in colors I pick out, and it's fairly inexpensive. It might be just what I need, who knows?

So no more than 15 minutes after my last post, I puked in the office restroom, and decided to grow some balls and ask for the day off. I want in to my boss's office and simply said "my stomach has been giving me trouble today, can i take the rest of today off and work on Friday?" he said sure, and I was on my way. I got home, and immediately fell asleep, where i slept (with several interruptions) until about 6am. So I called my boss, and left a voice mail letting him know that my upset stomach had turned full blown stomach flu. I went back to sleep, and just recently woke up. I think the afternoon calls for a tivo'ed how I met your mother marathon with sprite and crackers.

Oh me, Oh my.

So, Boyfriend was pretty sick all weekend, and even stayed home from work today.
Me... I was not feeling sick at all until this morning. and boy do i ever feel sick. I didn't even party last night, I relaxed. But I think I caught Boyfriend's bug, and now... here I am... fighting through nausea... at work. My boss intimidates me, and so I'm afraid to ask for the rest of the day off to go home and puke in private.

Any advice?

Stinky Feet

So, one thing I don't like about my job, is that I have to wear steel toed workboots each and everytime I go out into the plant.
Workboots are not cute.
So this means I have to change my shoes in order to do my outdoors work.
Now, for people that know me, they know I have stinky freaking feat. The words "moldy dank basement" have been used to describe the smell.
Anyway, my point is, that I hate that when I come back and change into cute shoes, my office smells. BUT today, I learned how to open up the window in my office, so... it's not so bad.

So, Eh.

So, today, I overslept big time.
I didn't make it into work until 8 (I'm normally here by 7), and my face is bare, and the contacts are not in. I guess at least I get to show off my fun new (PURPLE) glasses. And my boss has apparently taken the day off, so it might not be such a big deal that I was late.
I don't really feel like going outside, so i hope it's raining this afternoon, but, the chance of rain is only like 20%. I don't know, it could, it's definitley getting cloudyer than it was this morning. I don't have much i can do while hanging out inside.
Okay, i'm off to find a dispersion modeling program, and some valve data.